WeiBond 4000 with 90° Vertical Butt Welding Ships to the U.S. for Environmental Air Treatment Equipment
A WeiBond 4000 CNC plastic sheet butt welding system with 90° vertical welding capability has been prepared for shipment to the United States, where it will be used in the fabrication of corrosion-resistant equipment for the environmental air treatment sector.
Application Sector in the U.S.
The end-use application involves the production of components for:
• Air scrubbers
• Industrial fume extraction units
• Ventilation and exhaust ducting
• Odor control systems
• Environmental enclosures
These systems serve industries such as wastewater treatment, chemical processing, industrial emissions control, and other corrosion-prone environments.
Thermoplastic fabrication is widely adopted in these sectors due to its:
✔ Chemical resistance
✔ Corrosion immunity
✔ Lower lifecycle maintenance
✔ Lightweight installation
✔ Long service life
Materials Processed by the Customer
The U.S. customer processes a wide range of engineering thermoplastics, including:
• PVC (Polyvinyl Chloride)
• CPVC (Chlorinated PVC)
• PP (Polypropylene)
• HDPE (High-Density Polyethylene)
• PVDF (Polyvinylidene Fluoride)
• Sinoma Twin-Wall Sheets
This material portfolio allows them to cover both:
✔ Weigh-sensitive structural panels (25 mm twin-wall)
✔ High-load solid components (up to 40 mm solid sheets)
which are common in environmental protection equipment.
Why Vertical Butt Welding Matters
Environmental and air treatment equipment frequently incorporates rectangular assemblies and sealed geometries,s such as:
• Access doors
• Filter housings
• Duct transitions
• Inspection windows
• Containment boxes
The WeiBond 4000’s 90° vertical butt welding capability provides:
✔ True right-angle structural welds
✔ Molten pool stability under gravity
✔ Reduced reliance on extrusion welding for primary seams
✔ Better dimensional consistency in enclosure assembly
This results in stronger, cleaner, and more repeatable structural joints compared to extrusion-only fabrication.
System Configuration for the U.S. Deployment
The unit was configured with:
• 90° Vertical Butt Welding Capability
• CNC Control (Heating / Pressure / Cooling)
• 85 mm Wide Heating Plate for Thick Sheets
• Material Compatibility: PVC / CPVC / PP / HDPE / PVDF / Twin-Wall
• Sheet Thickness Capability: 25 mm twin-wall & 40 mm solid sheets
• SMC Pneumatic Clamping System
• Mitsubishi PLC & Industrial Control Electronics
• Electrical Supply: 3-phase, 208V, 60Hz
Before shipment, the system underwent:
✔ Temperature stability testing
✔ Vertical clamping and alignment checks
✔ CNC parameter calibration
✔ Electrical and control diagnostics
Export Packaging & Documentation
The machine has been packed with:
• Industrial-grade protective wrapping
• Structural reinforcement for transport
• Moisture-resistant barriers
Along with standard export documentation:
• Commercial Invoice
• Packing List
• Certificate of Origin
• Technical Specification Sheet
• Factory Acceptance Report
The shipment is now ready for dispatch.
Contact
For U.S. technical and commercial inquiries:
📩 Email: inquiry@weissenbergwelder.com
Images and workshop photos are available upon request.


